🇰🇷 한국어 🇺🇸 English 🇯🇵 日本語 🇪🇸 Español 🇨🇳 简体中文
Published: 2026.11.25 (Wed)
Company News

New 365-meter curved Panorama Walk opens atop Gubongsan Mountain

The Panorama Walk, a 27-meter high and 365-meter long experiential landmark, has been constructed atop Gubongsan Mountain in Gwangyang using advanced engineering to realize complex irregular curves.

New 365-meter curved Panorama Walk opens atop Gubongsan Mountain
A man smiling while holding a model of the architectural structure (Photo=POSCO Studio YouTube video capture)

Engineers have completed the 27-meter-high Panorama Walk at the 473-meter summit of Gubongsan Mountain in Gwangyang, using 3D modular construction and high-corrosion-resistant steel to overcome harsh winds and rocky terrain.

An irregular curved structure has been erected at the summit of Gubongsan Mountain in Gwangyang, located 473 meters above sea level, where strong winds and rocky terrain meet. Reaching 27 meters in height and 365 meters in total length, the 'Panorama Walk' is more than a mere sculpture; it is an experiential landmark where visitors can walk and stay. According to records shared by POSCO Studio, the project details the technical challenges and solutions faced by engineers on-site to implement the curves of the design blueprints into the actual structure.

The invisible force supporting irregular curves: special steel and precision welding

The core of the Panorama Walk lies in the structural stability hidden behind its elegant curves. Because the structure features an irregular shape with many curved and rotating sections, POSCO engineers continuously reviewed manufacturing and installation feasibility to adjust the design from the planning stage. To establish the gentle curves amidst the unpredictable weather at the mountain summit and limited working hours, precise technology was applied starting from the foundation work.

To withstand hundreds of tons of load, micro piles and anchor bolts were installed underground to support the structure. Inside the sculpture, 'Diaphragm' reinforcement plates are used to stably receive the load. Engineers meticulously managed the thickness and angle of the diaphragms, as well as the quality of the welding, to meet design standards. In particular, they focused on the internal diaphragms and precision welding processes to control the deflection and overturning that can occur in asymmetrical shapes.

The choice of materials was also strategic. To resist sea breezes and salinity, STS316 high-corrosion-resistant stainless steel and Duplex steel, which possesses both strength and corrosion resistance, were used. Additionally, steel pipes based on seismic-resistant SN steel form the structural skeleton to resist repetitive loads such as earthquakes. This combination of special materials and precision engineering established the foundation to endure the harsh environment at the mountain summit.

Achieving 1mm precision through 3D modular construction

To reduce errors on-site, '3D modular construction' was applied. When manufacturing individual parts in the factory, a 3D measuring instrument was used at each stage of sub-assembly, medium assembly, and large assembly to verify errors. The modules, perfectly fitted in the factory, were transported to the summit of Gubongsan Mountain, where they were completed into a continuous curve through a lifting and assembly process of approximately 8 hours per ramp.

The completed technology connects to the five senses of the visitors. Walking along the spiral ramp, visitors encounter 'Resonance of Light,' an experiential staircase supported by high-tensile rods. The structure, which responds minutely to the footsteps of visitors, turns the movement itself into an experience. At the peak of the journey, standing on 'Empty Floor,' a glass floor with a 5-meter diameter, a 360-degree panorama of industry and nature—including Gwangyang Bay, Yi Sun-sin Bridge, and Gwangyang Steelworks—unfolds.

Safety was the highest priority throughout the entire process. By setting core management points such as vehicle accidents caused by narrow roads and steep slopes, forest fire risks from hot work, and crane overturning accidents during bad weather, the project achieved completion without any accidents. The video states that the purpose of the technology is to create a state where people can fully enjoy the experience itself, forgetting the technical perfection when they use it.

Source: original video (YouTube)

#Panorama Walk #Gubongsan Mountain #POSCO #Gwangyang Bay #Yi Sun-sin Bridge #Gwangyang Steelworks #Resonance of Light #Empty Floor
H
Han Kyungsoo
TrendBiz · Reporter

Covers Economy for TrendBiz, and also writes about Company News and Finance.

More by this reporter ›
Copyright ⓒ TrendBiz All rights reserved. Unauthorized reproduction, redistribution, and AI training prohibited.

0Comments

Comments are currently disabled.

Be the first to comment.